Construction of Katuba substation, including a 120 kV line bay, a 120/15kV-24MVA transformer bay, the transformer itself, 15 kV equipment (feeders) and protections.
Construction of the Kipushi-Katuba line, over 10 km, with pylons and ACSR cables.
ABC / ABC CONTRACTING
SNEL
3.200.000 USD
Democratic Republic of Congo
2010 - 2011
Construction of Katuba substation, including a 120 kV line bay, a 120/15kV-24MVA transformer bay, the transformer itself, 15 kV equipment (feeders) and protections.
Construction of the Kipushi-Katuba line, over 10 km, with pylons and ACSR cables.