Engineering, Procurement, Construction (EPC) and assembly of the Hybrid Power Plant of Kiffa, in the middle of the desert:
– Solar: 1,3MWc
– Thermal: 5MW with ABC engines, running with HFO
ABC Engines / ABC CONTRACTING / Vergnet
Agence Française de Développement / Somelec
14.485.383,74 EUR
Islamic Republic of Mauritania
2014 - 2018
Engineering, Procurement, Construction (EPC) and assembly of the Hybrid Power Plant of Kiffa, in the middle of the desert:
– Solar: 1,3MWc
– Thermal: 5MW with ABC engines, running with HFO