30 kV lines to interconnect substations in Kinshasa.
The PMEDE M05 project consisted in the construction of MT overhead and underground lines, with connections to existing substations:
– Supply and assembly of more than 25 km of 30 kV double circuit overhead lines.
– Supply and installation of more than 135 km of 30 kV underground cables
– Connection of 30 kV lines to the various substations in Kinshasa.