Supply, installation and connection of MV/LV cabins.
The PMEDE M10 project consisted in the supply and connection of MV/LV cabins and the construction of MV overhead and underground lines with substation connections:
– Supply and assembly of 19 20/0,4 kV substations
– Supply and assembly of 16 6,6/0,4 kV substations
– Supply and assembly of 25 km of MT underground cable
– Supply and assembly of 3 km of MT overhead lines
– Supply of 8 km of LV overhead lines and 2,5 km of LV underground lines