Construction of a new Thermal Power Plant with ABC Engines, including connection to the MV grid
Procob / ABC
DGGT / SNE
2.445.820.560 FCFA (3.728.613 EUR)
Republic of Congo
2008 - 2009
Construction of a new Thermal Power Plant with ABC Engines, including connection to the MV grid