Rehabilitation of the INGA Hydro Power Plant (turbines G21& G22)
– Dismantling/reassembling of both turbines
– Rehabilitation of spiral cases and draft tubes (welding and corrosion protection)
– Rehabilitation of intake gates and stoplogs
– Rehabilitation of penstocks (corrosion protection, welding repairs, expansion joint)