Review of two turbo-alternator hydro electrical groups, electromechanical equipments, hydromechanical parts of the dam. Reconditioning of turbine elements (tree, hub, guide vanes) in our workshops in Belgium.
ABC / ABC CONTRACTING
World Bank / SNEL
6.848.502 EUR
Democratic Republic of Congo
2009 - 2011
Review of two turbo-alternator hydro electrical groups, electromechanical equipments, hydromechanical parts of the dam. Reconditioning of turbine elements (tree, hub, guide vanes) in our workshops in Belgium.