Upgrade of the Medium Voltage power grid from 6,6 kV to 30kV in Rubavu (Rwanda), for EDCL.
ABC CONTRACTING & Rwandamotor
EDCL / Enabel
4.277.942 EUR
Rwanda (Rubavu)
2020 -
Upgrade of the Medium Voltage power grid from 6,6 kV to 30kV in Rubavu (Rwanda), for EDCL.